Clear Water was contracted to Prospect Construction for the Prospect South Park Pump Station construction project.This project is owned by the City of Seattle and is centered around the preparatory work for the eventual South Park water treatment system.This treatment system has been operational since October of 2020 and is designed to meet a design flow rate of 200-GPM,The project utilizes adsorptive multi-media (through virgin granular activated coconut carbon (GAC)) to address chlorinated solvents in dewatering applications, but numerous other contaminants were discovered when excavation began.