This small-footprint system was installed for sump dewatering and stormwater runoff treatment on a 1-acre construction site at The University Village in Seattle, WA.The project encountered a much lower dewatering flowrate than anticipated, shortening the duration of the project.Clear Water trained and certified an employee of the contractor, Mid Mountain Construction, to become a CESF operator.